Serving Calgary and surrounding areas (825) 712-1207Book a Free Pre-Lease Review →
  1. Home
  2. Tenant Improvements
  3. Medical & Dental Clinics

MEDICAL, DENTAL, PHYSIO & SPECIALTY CLINICS

Medical and dental clinic construction in Calgary

Your clinic designed, engineered, permitted and built by one firm. We plan the approvals first, because that's where clinic openings get delayed.

A finished exam room with a padded treatment table, wall-mounted instruments, white cabinets and a window

Why clinics are different

A clinic isn't a normal tenant improvement

Clinic build-outs rarely go wrong over drywall or flooring. They go wrong over approvals. On top of the building code, a clinic may need radiation safety approval for X-ray, medical gas certification, special ventilation and approval from your professional college. Each has its own timeline, and any one of them can push back your opening.

  1. 01

    Use and occupancy

    Turning a space into a clinic can change how the building code treats it. That can mean new requirements for exits, washrooms, corridor widths and accessibility. We check this before design starts.

  2. 02

    X-ray rooms and shielding

    X-ray rooms need shielding in the walls, and the equipment must be registered in Alberta before you use it. We work with the radiation specialist from the start, so shielding is built in during framing, not added after the walls are finished.

  3. 03

    Medical gas, vacuum and suction

    Oxygen, nitrous oxide and suction lines must meet CSA standards and be installed, tested and certified by qualified trades. It's one of the most underestimated parts of a dental fit-out, so we plan it in from day one.

  4. 04

    Plumbing, ventilation and infection control

    Sterilization rooms, handwashing sinks, backflow prevention and separate exhaust for certain rooms all shape the mechanical design. We design them in from the start instead of cutting them in late.

  5. 05

    Accreditation

    If you'll perform procedures, your professional college may need to approve the facility before you treat patients. We design to their standards from the start, so the space is ready for their review.

What we plan for

What we plan for in every clinic

Before the first drawing is issued, every clinic goes through this checklist, so nothing turns up as a change once the walls are up.

Clinic checklist

  • Clinic use confirmed with the City before you sign
  • Building code items: exits, washrooms and accessibility
  • X-ray shielding planned with a radiation specialist
  • Medical gas and suction planned to CSA standards
  • Sterilization, handwashing and ventilation designed in
  • College approval requirements built into the design
  • Long-lead equipment and millwork ordered early

Clinics We Build

Clinics we build

  • Medical clinics

    Exam and treatment rooms, reception and accessible washrooms, with the plumbing, ventilation and privacy clinics need.

  • Dental clinics

    Operatories, X-ray rooms, sterilization and staff spaces, with medical gas, suction and shielding planned from day one.

  • Physiotherapy clinics

    Treatment rooms, exercise areas and change rooms, with the right flooring, floor strength, plumbing and clearances.

  • Specialty clinics

    Optometry, chiropractic, dermatology and other specialty clinics, built around your equipment, workflow and privacy.

  • Pharmacies and labs

    Dispensaries, compounding rooms and sample collection areas, built to the requirements your licence needs.

How it works

How a clinic build-out runs with us

  1. Not every space can become a clinic. We check zoning, plumbing, ventilation, accessibility and room for X-ray before you commit.

  2. We start while your lease is being finalized and bring in specialists for X-ray shielding and medical gas early. Have your own consultants? Send us their drawings.

  3. We don't give a final price without a design, so the number you get is one you can rely on.

  4. We map every approval your clinic needs from the City, and plan each one into the schedule.

  5. Dental chairs, sterilization equipment, medical gas parts and custom millwork can take weeks, so they're ordered early and arrive on time.

  6. We book City inspections, have medical gas and X-ray rooms tested and certified, fix any deficiencies and hand over a clinic ready for its first patient.

Recent clinic work

Recent clinic projects

See all projects

Before you sign

Before you sign, let us review the space

Signing before you confirm the space can be used as a clinic is the most expensive mistake in a clinic build-out. If the City has to review and approve the clinic use, it can add weeks before construction even starts.

If anything comes back badly, you'll know while you still have room to negotiate with the landlord.

We'll review the space with you before you commit

  1. 01Use: whether a clinic is allowed in this space, or needs City approval first
  2. 02Parking: whether the building has enough for your patients
  3. 03Plumbing and ventilation: whether there's enough for sinks, sterilization and exam rooms
  4. 04X-ray: whether there's room and structure for shielding, if you need it
  5. 05Budget and timeline: a rough budget range and a realistic path from lease to opening

Free, no obligation.

Book a Free Pre-Lease Review

Already have drawings or a signed lease? Send them and we'll come back with a scoped budget and schedule.

Questions

Clinic build-out questions

Often, yes. Changing how a space is used usually needs City approval. In some areas a clinic is allowed automatically; in others, the City has to review it first, which takes longer.Our Pre-Lease Review checks this before you sign.

Usually, yes. Most college reviews happen once the clinic is built, but check with your college early. The bigger risk is building something that doesn't meet their standards, so we design to them from the start.

Not without a plan. Construction next to an open clinic brings noise, dust and vibration that can affect patients and their care. Before any work starts, we meet with you, the landlord and the neighbouring tenants to agree on a plan, such as after-hours work, dust control and quiet periods.

It depends on the space, the approvals and the equipment. Approvals take much of the time, which is why we start them early. You'll get a full schedule once the drawings are ready.

It depends on the number of exam rooms or operatories, X-ray, and what the building already has. After a walk through, we give you a rough budget range. Once the drawings are done, you get a final price.

Next step

Looking at a space for your clinic?

Send us the address before you sign. We'll tell you whether it can work, and what it will take.

Pre-Lease ReviewGet a Free Estimate