Serving Calgary and surrounding areas (825) 712-1207Book a Free Pre-Lease Review →
  1. Home
  2. Tenant Improvements
  3. Office Fit-Outs

For professional firms, head offices, law, accounting & tech

Office Fit-Outs in Calgary

Design, engineering, permits and construction for your office, built around how your team works. One firm, one contract, one project manager.

An open office floor with desks and monitors beside a glass-walled boardroom, with downtown Calgary towers in the windows

What we build

Fit-outs to renovations

Whether you've leased bare space or you're gutting a tired floor, an office has to work on the first Monday your team walks in. We build the spaces behind that.

Spaces we build

  • Workspaces
  • Meeting rooms
  • Reception areas
  • Staff rooms
  • Support spaces

Why fit-outs go sideways

Where an office fit-out loses time

Most office delays start before anyone picks up a hammer. They start in the lease, in the drawings, and in the permit queue.

  1. 01

    The lease

    The tenant improvement allowance, who controls construction, who pays for permits and professional fees, and what stays with the landlord at the end of the term all get set before you sign. Miss one and it comes out of your budget.

  2. 02

    The building

    Old electrical panels and too little HVAC capacity are easy to find on a walk-through and expensive to find after demolition.

  3. 03

    The permit

    Adding or removing walls, electrical or plumbing upgrades and HVAC changes all need a building permit. We prepare the drawings and manage the application with the City of Calgary.

Before you sign

Before you sign, let us look at the space

A walk-through before you sign is the cheapest way to find out what an office will cost to build. We'll review the space with you, free and with no obligation.

Calgary's downtown office market has given tenants room to negotiate. CBRE data from early 2026 put downtown office vacancy above 30 percent, and landlords competing for tenants may offer a larger allowance. That only helps if you've priced the work before you sign.

We'll review the space with you

  1. 01Capacity: whether the building's electrical and mechanical services are enough for your layout, or an upgrade will land on your budget
  2. 02Code exposure: occupancy, accessibility and permit triggers
  3. 03Allowance: what to ask the landlord for, and what the lease needs to say about it
  4. 04Timeline: a realistic path from lease to move-in

Free, no obligation.

Book a Free Pre-Lease Review

Already have a floor plan or a signed lease? Send it and we'll come back with a scoped budget and schedule.

How it works

How an office build-out runs with us

  1. 01

    Pre-lease review and consultation

    We walk the space with you before you sign, check what the building needs and give you a rough budget range to plan around.

  2. 02

    Design, engineering and permit (if you need it)

    We start the design while your lease is being finalized, and our in-house engineer stamps the drawings. Working with your own consultants? Send us their drawings instead.

  3. 03

    Quote and schedule

    Once the drawings are ready, we give you a detailed price and a schedule to move-in. We don't price work without a design, so the number you get is one you can rely on.

  4. 04

    Permit

    If we're handling the permit, we submit it to the City as soon as the drawings are ready. No one controls how long the review takes, so the earlier it goes in, the better.

  5. 05

    Long-lead items

    We order materials that take weeks to make, like glass, millwork and fabricated steel, while the permit is under review, so they're on site when we need them.

  6. 06

    Construction and move-in

    One project manager runs every trade, including data cabling and furniture, and keeps you updated weekly. We book the City inspections, fix any deficiencies and hand over an office ready for your first Monday.

Occupied buildings

Building while the rest of the building is open

If other tenants are working in the building during your fit-out, we plan around them. Noisy work like demolition and coring is scheduled after hours when needed, dust is contained, and we book elevators and loading docks through building management. Hallways and shared spaces stay clean and protected every day.

Budget and timeline

What an office fit-out costs and how long it takes

It depends on the size, the layout and the condition of the building. After a walkthrough, we give you a rough budget range to plan around. Once the drawings are done, you get a final price and a schedule to move-in. Most of the timeline is set before construction starts: design, landlord approval, the City permit and long-lead materials. That's why we start the design and order early.

Questions

Office fit-out questions

It depends on the size, the layout and the building's electrical and HVAC. After a walkthrough, we give you a rough budget range. Once the drawings are done, you get a final price. We recommend setting aside 10 to 15% for conditions nobody can see until work starts.

Money the landlord contributes toward your build-out. It's usually negotiated before you sign and set as a dollar amount per square foot. Make sure the lease says the amount, who controls construction, who pays for permits and professional fees, and what happens to any unused allowance.

Yes. If you already have a design team and they're handling the permit, send us their drawings and we'll give you a construction price and schedule.

In most cases, yes. Moving walls, or changing electrical, plumbing, HVAC or fire safety systems, needs a permit and inspections. Simple cosmetic work, like painting, usually doesn't. We handle the application for you.

Before you sign the lease.We'll inspect the space, give you a rough budget range and flag building conditions that could affect your budget or timeline, so you can use it in your lease negotiation. Book a free Pre-Lease Review.

Yes. We plan the schedule around neighbouring tenants who are open for business.

Most office fit-outs take about 8–12 weeks on site. The permit process usually adds 4–8 weeks before that, depending on the City's review. We'll give you a schedule for your space once the drawings are ready.

Call (825) 712-1207 or request a free estimate. We’ll send you a clear, detailed proposal.

Call (825) 712-1207 or book a free Pre-Lease Review. You'll get a rough budget range after the walk through, and a final price once the drawings are done.

Next step

Looking at an office space?

Send us the address, your team size and layout. We’ll walk the space with you and give a budget range before you sign.

Pre-Lease ReviewGet a Free Estimate